Grey backgrounds, reserved color, and displays designed to make abnormal conditions obvious rather than to look impressive in a demo.

8 min readUpdated Jul 24, 2026Published Apr 2, 2026By Eric Sullivan

The short answer

High Performance HMI Design

High performance HMI is a design approach where operator displays are built to make abnormal conditions immediately obvious. Backgrounds are low-contrast grey, process elements are drawn in muted outline, and saturated color is reserved almost entirely for alarms and abnormal states. It is codified in ISA-101 and stands in contrast to the photorealistic, heavily colored graphics that dominated early SCADA.

Key points

  • Color carries meaning. If everything is colored, color means nothing.
  • Grey backgrounds with muted process elements make an abnormal condition jump out.
  • Analog values benefit from context: a bar with limits beats a bare number.
  • Hierarchical displays let an operator move from plant overview to detail predictably.
  • The test is whether a new operator can identify the abnormal item in a few seconds.

The problem it solves

Early SCADA graphics were built to impress. Three-dimensional tanks, green running pumps, blue pipes with animated flow, red where something was off. In a demonstration this looks like a control system. At 3 a.m. during an upset, an operator has to find the one abnormal item on a screen where everything is already vividly colored, and the search takes far longer than anyone estimates.

High performance HMI inverts the design. The normal state is deliberately quiet. Anything that draws the eye is doing so because it needs attention.

Core principles

Low-contrast grey background
A mid-grey field rather than black or white. It reduces eye strain over a twelve-hour shift and gives both light and dark elements room to stand out.
Reserved color
Saturated color is used almost exclusively for abnormal conditions and alarm priority. Running equipment is a subtle outline change, not a green fill.
Depiction over decoration
Flat, two-dimensional shapes. No bevels, gradients, or photorealistic vessels. They add nothing an operator uses and cost visual bandwidth.
Analog context
A number alone tells you the value. A number with a bar showing the normal operating range and the alarm limits tells you whether to care.
Consistent layout
The same information in the same place on every display. An operator should not have to search for where a pump status lives on this particular screen.
Deliberate hierarchy
Level 1 plant overview, level 2 process area, level 3 equipment detail, level 4 diagnostics. Navigation between them is predictable and always available.

A workable color convention

MeaningTreatmentNotes
Normal runningDark outline, light fill, no saturated colorStatus is legible without being loud
Normal stoppedSame shape, lighter fill or hatchedDistinguishable at a glance without color
Critical alarmSaturated red, usually with a shape indicatorReserved exclusively for this
High priority alarmSaturated amber or orangeReserved exclusively for this
Low priority alarmYellow, lower emphasisReserved exclusively for this
Bad or stale dataHatching, greying, or an explicit markerMust never look like a live value
Operator command in progressBrief distinct treatmentConfirms the system heard the command

Displays for a water utility

A municipal utility has a specific shape of problem: many similar remote sites, a plant, and a small number of operators covering all of it.

  • Build one standard lift station display and reuse it for every station. Operators learn one layout instead of sixty.
  • The overview should answer the only question that matters on a callout: which sites are in trouble right now.
  • Show communication health explicitly. A station that has not reported is a different problem from a station reporting a high level.
  • Put pump run hours and start counts where they are visible. This is how maintenance planning actually happens.
  • Trend wet well level directly on the station display. The shape of the last few hours tells an experienced operator more than any single number.

Retrofitting an existing system

Rebuilding every graphic at once is rarely fundable, and it disorients operators. A staged approach works better.

  1. 01Write a short style guide first, even one page. Without it, the second display will not match the first.
  2. 02Fix color misuse before layout. Removing saturated color from normal states is the highest-value change and the cheapest.
  3. 03Add analog context to the values operators actually watch, starting with levels and pressures.
  4. 04Build a genuine overview display if none exists. Most systems do not have one.
  5. 05Convert area displays one at a time, with operator review at each step.
  6. 06Involve the people who run the plant at night, not only the day shift. They see different problems.

Frequently asked questions

Is ISA-101 required?
No. It is a consensus standard describing a lifecycle for HMI design. It is often cited in specifications and is treated as good practice, but it is not a regulation for municipal water and wastewater.
Will operators accept grey screens?
Usually yes, once they have worked a shift on them, and the objection almost always comes before the trial rather than after. Involving operators in the design and converting one area first makes the difference between adoption and resistance.
Should running pumps be green?
Under this approach, no. Green fill on every running pump spends your most attention-grabbing resource on the most common and least interesting state. Use a subtle outline or fill difference for running, and keep saturated color for conditions that need action.
How many displays should a system have?
As few as will cover the plant with a clear hierarchy. Large numbers of near-duplicate displays are a symptom of missing reusable templates, and they multiply the cost of every future change.

Direct contact

Have a controls question?

Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.