Skip to main content
Call Eric:863-698-8266
CURRYCONTROLS.COMControls & Automation Knowledge Hub
ReferenceWastewaterPumpsLift StationsControlLevel

Constant Speed Pump Control

On and off pumping with constant speed pumps: why it remains the right answer at most lift stations, the level bands and the wet well volume that set the cycle, starts per hour and motor limits, and the cases where variable speed is worth its cost.

8 min readUpdated Sep 5, 2026Published Sep 5, 2026By Eric Sullivan

The short answer

Constant Speed Pump Control

Most lift stations run constant speed pumps on and off by level, and most of them should: a submersible pump at full speed moves the water, scours the force main, and clears itself of rags in a way that a pump at half speed does not, and the wet well provides the storage that makes on and off pumping smooth enough. The design sets the level bands from the wet well volume so that the pumps cycle within their starts-per-hour rating at the worst inflow, stages the lag pump for inflow beyond one pump, alternates the lead so that both pumps share the duty, and starts the motors across the line or with soft starters according to what the electrical service and the force main can take. The controls are simple and the simplicity is a virtue at a site visited once a month; the concerns are septicity in a wet well that sits too long between cycles, grease and solids that accumulate at the off level, surge on the force main from full-speed stops, and the electrical inrush of a large motor. Variable speed earns its place where flow must be matched to a downstream limit, where the force main or the electrical system cannot take the starts, or where the energy case is real.

Key points

  • On and off by level with the bands sized from the wet well volume and the starts-per-hour rating.
  • Full-speed pumping scours the force main and clears rags; it is a feature, not a limitation.
  • Alternate the lead and stage the lag; both pumps share the duty and both are proven daily.
  • Soft starters where the inrush or the surge is a problem; across the line where it is not.
  • Watch septicity, grease at the off level, surge on stop, and the starts count; these are the failure modes of constant speed.

The bands

The off level sits above the pump minimum submergence; the lead-on level sits above it by a volume that gives an acceptable cycle at the inflow that produces the most starts, which is an inflow of about half the pump capacity; the lag-on level sits higher by enough volume to let the lead pump prove itself before the second is called; the high alarm sits above that with time to respond; and the overflow is above everything with as much margin as the well provides. The bands are entered on the screen with limits, shown on the level display, and written in the control narrative.

Starts per hour (worst case) = 60 × Q_pump ÷ (4 × V_cycle)

  • Q_pump = pump capacity in gallons per minute
  • V_cycle = wet well volume between the off and lead-on levels in gallons
  • The worst case occurs at an inflow of half the pump capacity; keep the result within the motor rating, often 6 to 10 starts per hour for submersibles, and check the manufacturer value

Starting

MethodInrushForce mainWhen
Across the lineSix to eight times full load currentFull-speed start and stop; check valve slam and surge on long or steep mainsSmall motors, short mains, a stiff electrical service
Soft starterReduced to two or three timesRamped start and, with a soft stop, a gentler check valve closureLarger motors, generator power, mains that hammer
Drive used as a soft starterLowRamped both ways; can also match flowWhere a drive is justified for other reasons

A soft stop matters more than a soft start on many force mains: a full-speed pump stopped by opening its contactor lets the column reverse and slam the check valve, and the pressure wave travels the main. Soft starters with a ramp-down, slow-closing check valves, and surge relief where the main is long address it. The generator sees the inrush too, and a staggered start with a soft starter is what lets a modest generator carry two pumps.

Alternation and staging

The lead alternates each cycle so that both pumps run daily and wear evenly; the lag starts when the level reaches its band, which means inflow exceeds one pump or the lead is not delivering; and a pump that fails is skipped with the other promoted and an alarm raised. A triplex station adds a standby stage. All of this lives in a small controller with a relay backup on floats, or entirely in relays with an alternator on a simple station, and the logic is tested by faulting each pump.

The concerns

Septicity
Wastewater that sits in a wet well for hours at low inflow goes septic and produces sulfide, which corrodes concrete and smells. A minimum cycle frequency, achieved by a lower off level at night or a timed pump-down, keeps the detention within limits; the trade is starts.
Grease and solids
Fats and rags float and collect at the off level and on the walls. A periodic pump-down below the normal off level, to the minimum submergence, skims the accumulation into the force main; the sequence runs it on a schedule and never with the level control blind.
Surge
Full-speed stops on a long main; addressed by soft stops and valves as above.
Starts
A band that has drifted or a float that sticks raises the starts per hour past the motor rating and the motor fails hot; the starts count per pump is trended and alarmed.
Ragging
A pump that runs long with rising current is wrapped in rags; some controllers run a reverse or a repeated start sequence to clear it, and the current trend is the detection.

When variable speed earns its cost

  • Flow must be limited to what a downstream plant or main can take.
  • The force main or the electrical system cannot tolerate full-speed starts and stops even with soft starters.
  • The station has enough friction head that the energy saving is real, which is rarer than the sales literature suggests.
  • Two stations in series need to be matched so that the upper one does not flood the lower one.
  • Even then, a periodic full-speed run to scour the main is part of the sequence.

Frequently asked questions

How low should the off level be?
At the minimum submergence the pump manufacturer specifies for continuous operation, so the pump does not draw air or lose cooling; a periodic skim cycle goes lower for a short time under supervision of the logic.
The pumps start ten times an hour on a rainy day.
The inflow is near half the pump capacity, which is the worst case, and the cycle volume is too small for it. Widen the band between off and lead-on if the well allows, or accept the starts for the duration if they are within the rating and rare.
Should the lag pump start on level or on time?
On level; time is a proxy that guesses. The lag band is set so that the lag comes in when the lead is genuinely not keeping up, and a lead that fails to start promotes the lag immediately regardless of level.
Do I need a soft starter on a 10 horsepower submersible?
Usually not for the motor or the service; possibly for the force main if it is long and the check valve slams. The surge symptoms, a banging valve and a pressure spike on the gauge at stop, decide.

Direct contact

Have a controls question?

Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.