Network Drawings

The two drawings every control network needs: a logical drawing of zones, subnets, VLANs, firewalls, and conduits, and a physical drawing of switches, ports, cables, fiber, radios, and sites. What each shows and why they are sensitive.

9 min readUpdated Sep 5, 2026Published Sep 5, 2026By Eric Sullivan

The short answer

Network Drawings

A control network is documented with a logical drawing and a physical drawing. The logical drawing shows the security zones, the VLANs and subnets in each, the firewalls and routers between them with the conduits they permit, the servers, controllers, and remote sites as members of their zones, and the paths to the office, the DMZ, and the outside. The physical drawing shows every switch with its ports, the cables and fiber between them with their identifiers and media, the patch panels, the radios and modems with their links and frequencies, and the remote sites with their equipment. Both carry the addresses and identifiers that the network schedule holds in full, both are marked as sensitive because together they are the attacker map, and both are revised through change management so that the drawing, the schedule, the switch port descriptions, and the firewall rules agree.

Key points

  • Logical: zones, subnets, VLANs, firewalls, conduits. Physical: switches, ports, cables, fiber, radios, sites.
  • The logical drawing is the segmentation design made visible; every firewall rule should be a line on it.
  • The physical drawing is what a technician uses to find a cable and what an outage is diagnosed from.
  • The network schedule holds the detail; the drawings show the structure and reference it.
  • The drawings are sensitive: access-controlled, not in the bid set, not on the shared drive.
  • Change management revises the drawing, the schedule, the port descriptions, and the rules together.

The logical drawing

ElementShown asDetail carried
Security zonesBounded regions, labeled with the zone name and levelControl, supervisory, engineering, DMZ, office, remote sites
Subnets and VLANsLabels inside each zoneNetwork address and mask, VLAN number
Firewalls and routersSymbols on the zone boundariesName, management address, the interfaces to each zone
ConduitsLines crossing a boundary through a firewall, labeledProtocol, direction, source and destination groups; each is a rule set
Servers and workstationsSymbols in their zoneName, role, address
Controllers and remote unitsSymbols in the control zone, grouped by area or siteName, address, protocol
Remote sitesA zone per site with its linkLink type, the site boundary device, the site subnet
Paths outwardLines to the DMZ, the office, the cloud, the vendorWhat crosses, through what

The logical drawing is the picture of the segmentation design. A reader should be able to look at it and say what can talk to what and through which firewall, and the firewall rule set should correspond to the conduits drawn. When the drawing and the rules disagree, one of them is wrong, and the review finds which. It changes rarely, when a zone is added or a conduit opened, and it is the drawing shown to the assessor, the insurer, and the new engineer on the first day.

The physical drawing

ElementShown asDetail carried
SwitchesA symbol per switch with its port layoutName, model, location, management address, uplinks
CablesLines between ports, labeledCable identifier, media, length, the port at each end
FiberLines with a distinct styleCable identifier, strand numbers used, type, patch panel and port at each end
Patch panelsSymbols at each end of a fiber or a structured cable runPanel name, port numbers
Radios and modemsSymbols with their links drawn as pathsFrequency or carrier, antenna, the link partner
Firewalls, routers, servers, controllersSymbols at their portsName and the switch port they connect to
Remote sitesA site box with its switch, controller, radio, and the linkSite name, equipment, link
PowerThe UPS and power source for network equipment where relevantWhich UPS feeds which switch

The physical drawing is the one opened during an outage: which switch is the device on, which port, which cable, which fiber pair, which patch panel. It is also the one that tells a technician whether a cable can be unplugged and what will drop if it is. It changes every time a device is added or moved, which is often, and it is the drawing most likely to be out of date. The switch port descriptions, set from the same data, are the copy of it that lives inside the switch.

Producing them

  1. 1

    Start from the inventory and the schedule

    Every device with its address, VLAN, switch, and port is in the network schedule; the drawings are views of it.

  2. 2

    Draw the zones first

    The logical drawing from the segmentation design, with the conduits from the firewall rule design.

  3. 3

    Draw the switches and links

    The physical drawing from the switch configurations, the cable and fiber schedules, and the site walk.

  4. 4

    Reconcile

    Every device on one drawing is on the other and in the schedule; every conduit has rules; every port with a description has a line on the drawing.

  5. 5

    Mark and protect

    Both drawings marked as security-sensitive, stored with the security documentation, issued to those who need them, and removed from bid sets and general drawing indexes.

  6. 6

    Revise through change management

    A change record that touches the network includes the drawing revision, the schedule update, the port description, and the rule change.

Telemetry systems

A radio or cellular telemetry system gets its own physical drawing: the master radio and its antenna, the repeaters, each site with its radio, the paths drawn with their frequencies or carriers, and the path study results such as signal margin recorded beside each link. The drawing is what the radio technician uses to diagnose a site that stopped talking and what the utility uses to plan a new site. Cellular sites show the carrier, the private network or the tunnel, and the modem. The logical drawing shows the same sites as zones with their conduits; the telemetry drawing shows how the bits get there.

Frequently asked questions

We have one drawing that mixes logical and physical. Is that acceptable?
For a very small system, a single drawing that shows the firewall, the switches, and the devices with addresses can serve both purposes. Beyond a handful of switches, the mixture becomes unreadable, and the two drawings are separated: structure on one, cabling on the other.
What symbols should we use?
A consistent set: the project standard defines a symbol for each device type and a line style for each medium, and every drawing uses them. Vendor icon sets are fine for the physical drawing; the logical drawing benefits from plain boxes and labeled boundaries that anyone can read.
How much detail goes on the drawing versus the schedule?
The drawing shows names, addresses, and identifiers enough to find a device; the schedule holds every field. A drawing that tries to hold every MAC address and firmware version is unreadable and always out of date; a schedule holds them naturally.
Who is allowed to see the network drawings?
The control system staff, the integrator under contract, the assessor under agreement, and management on request. Not the general drawing index, the shared drive, or the bidders as a matter of course. The drawings are the map of the system; treat them as the security documentation they are.