The short answer
Wells
A groundwater system runs its wells by demand, usually from the level of a storage tank or a pressure setpoint, rotating among wells to share wear and to manage water quality and aquifer drawdown. Each well start typically pumps to waste for a period or until turbidity clears, then diverts to the system, with chlorine and any other treatment paced to the well flow. Well level is monitored to track drawdown and specific capacity and to protect the pump from running dry, and each well reports flow, pressure, level, residual, and pump status by telemetry, with interlocks for low level, low flow, and high turbidity and a minimum run time to limit cycling.
Key points
- Wells run by tank level or pressure, in a rotation that shares hours and manages the aquifer.
- Pump to waste on every start until the water clears; then divert to the system with chemical feed paced to flow.
- Drawdown and specific capacity are the health record of a well; trend them from the level transmitter.
- Low level, low flow, and high turbidity interlocks protect the pump and the system.
- Blending is a ratio control problem: hold the mixed concentration below the limit with margin.
- A well is a remote site; telemetry, backup control, and a local fallback are part of the design.
Running the wellfield
A groundwater system has no raw water pumps and no intake; the wells are the source and the pumps together. Demand is met by starting wells, and the call to start usually comes from a storage tank level, from system pressure where there is no storage, or from a schedule. With several wells, the controller selects which to run by a rotation that equalizes run hours, by a priority list that favors the best water or the cheapest power, or by a combination, and it allows the operator to remove a well from the rotation for maintenance or a water quality problem. Wells with different water quality are run in combinations that keep the blended water within limits, which is a control function in its own right.
The start sequence
- 1
Call and permissives
Tank level below the start point or pressure below setpoint; the well in AUTO and available; minimum off time elapsed; well level above the low cutoff.
- 2
Start the pump to waste
The waste valve open and the system valve closed, so the first water goes to a drain or a pond. Submersible pumps start across the line or on a soft starter; drives are less common on wells but used where flow must be controlled.
- 3
Wait for clear water
A timer, commonly a few minutes, or a turbidity reading below setpoint, whichever the operating permit or the plant practice specifies. Sand and turbidity are highest at the start.
- 4
Divert to the system
Open the system valve, then close the waste valve, in that order so the pump is never dead-headed. Start chemical feed when flow to the system is proven.
- 5
Run and monitor
Flow, discharge pressure, well level, residual, and pump current. Stop on the tank high level or pressure high setpoint after the minimum run time.
- 6
Stop
Stop chemical feed, stop the pump, and allow the check valve to close; some installations close the system valve first to limit surge.
Level and specific capacity
The water level in the well drops when the pump starts, from the static level to a pumping level, and the difference is the drawdown. The flow divided by the drawdown is the specific capacity, in gallons per minute per foot, and it is the single best indicator of the condition of the well: a falling specific capacity means the screen is plugging, the aquifer is declining, or the pump is wearing. A submersible pressure transmitter hung in the well, or a bubbler airline, measures the level continuously; the controller computes drawdown and specific capacity at a fixed time after each start and trends them. A low level cutoff stops the pump before it breaks suction, with a delay so that the initial drawdown does not trip it.
Specific capacity = Q / (static level − pumping level)
- Q = well flow in gallons per minute at the time of the level reading
- static level = depth to water with the pump off and the well recovered
- pumping level = depth to water at a fixed time after start, often 30 or 60 minutes
Wellhead treatment
- Chlorination: hypochlorite paced to well flow, with a residual analyzer downstream of the contact main or the tank and an alarm on low residual. Groundwater rule requirements for virus inactivation set the contact time some systems must demonstrate.
- Fluoride: paced to flow, with a maximum feed limit, a day tank sized to make an overfeed impossible, and an alarm on high residual.
- Sequestering: polyphosphate for iron and manganese, paced to flow.
- Iron and manganese removal: aeration and filtration or oxidation and filtration at a central site, with the well flow steady enough for the filters.
- Corrosion control: orthophosphate or pH adjustment, paced to flow.
- All feeds interlocked with proven flow to the system, and none running during pump-to-waste unless the permit requires it.
Blending
A well with nitrate or arsenic above the limit can often be used by blending it with cleaner wells so that the combined water meets the standard. The control holds the ratio of the high-concentration well flow to the total below a limit computed from the concentrations, with margin for measurement error and variation, and it prevents the high-concentration well from running alone. Flow from each well is measured, the ratio is computed continuously, and the blend is alarmed and the problem well stopped if the ratio is exceeded. Regulators generally expect the blend to be demonstrated by sampling at the point of entry, and the control records support that.
Telemetry and protection
| Point | Purpose |
|---|---|
| Pump running, in AUTO, fault | Status and alarm |
| Flow | Pacing, totalizing, blending, low-flow detection |
| Discharge pressure | System pressure, dead-head detection, check valve failure |
| Well level | Drawdown, specific capacity, low-level cutoff |
| Chlorine residual | Treatment verification and alarm |
| Turbidity where fitted | Pump-to-waste diversion and sand alarm |
| Valve positions | Waste and system valves; sequence confirmation |
| Motor current, power | Pump condition, power outage detection, energy |
| Intrusion, power fail, communication status | Site security and telemetry health |
Frequently asked questions
- How long should a well pump to waste?
- Long enough for the water to clear, which depends on the well. Many systems use a fixed time of a few minutes set from experience; a turbidity instrument makes it a measured condition and lets the time shrink for good wells. The permit or the state guidance may specify a minimum.
- Why rotate wells rather than always run the best one?
- Running one well continuously draws the aquifer down locally, wears one pump, and leaves the others idle where their pumps and screens deteriorate. Rotation shares the load and keeps every well proven. Priority within the rotation can still favor the best water or the lowest cost.
- What does a sudden drop in specific capacity mean?
- A change in the well or the pump rather than the aquifer, which changes slowly: a plugged screen, a broken column pipe or a failed check valve, a worn impeller, or a level transmitter that has moved. Compare flow, current, and pressure with the previous run; a broken column shows normal current and low flow.
- Can a drive be used on a well pump?
- Yes, where flow must be matched to demand or blended, and with attention to the motor and cable, since submersible motors have minimum speed and cooling requirements. Most wells run at full speed into storage, where a drive adds cost without benefit.
Related topics
- Well Pump ControlControlling a groundwater well: submersible and line-shaft turbine pumps, the pump-to-waste start, drawdown and the low-water cutoff, cycling limits from the well and the aquifer, and what the controller monitors to protect a pump that cannot be seen.
- Tank Level ControlHow a storage tank is filled and drawn on level setpoints, how the setpoints are chosen to keep the water turning over, and what the station does when the tank stops talking.
- Disinfection ControlControlling chlorine and chloramine dosing at a water plant: the CT concept and how contact time is credited, flow-paced and residual-trimmed feed, gas, hypochlorite, and on-site generation systems, the point-of-entry residual as the compliance measurement, and the interlocks that stop a feed system from over- or under-dosing.
- Chemical FeedChemical feed from the control side: the chemicals and where they go, metering pumps and dry feeders, flow pacing with residual trim, the dose arithmetic, day tanks and drawdown tests, loss-of-feed detection, interlocks, and overfeed protection.
- Hydrostatic Level MeasurementMeasuring level from the pressure of the liquid above a sensor: submersible transducers, bubblers, and base-mounted transmitters, the density assumption behind all of them, venting, installation, and what makes them drift.
- Chlorine Residual AnalyzersAmperometric and colorimetric residual analyzers: what each measures, free versus total chlorine, pH and flow dependence, sample line design, calibration against a DPD grab sample, and using the signal for feed control.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.