A well pump lifts groundwater from a submersible or a line-shaft turbine pump set hundreds of feet down a casing, and its controls protect a pump that cannot be inspected: a low-water cutoff from a level probe or a transducer keeps it from pumping the well dry, a pump-to-waste period at each start discards the first minutes of turbid water, minimum run and off times respect the motor and the aquifer, and the controller monitors current, flow, and drawdown for the slow signs of a failing pump or a declining well.
Key points
- The pump is at the bottom of a hole. Everything the controller knows comes from current, flow, pressure, and level.
- Low-water cutoff is the protection. A submersible run dry is destroyed in minutes.
- Pump to waste at start until turbidity and residual are acceptable, then to the system.
- Starts are expensive on a large submersible. The cycle is set by the tank, not the well.
- Trend drawdown and specific capacity. A well declines slowly, and the trend is the only warning.
What is down the hole
A production well is a cased hole to an aquifer, with a screen at the bottom where the water enters. The pump is either a submersible unit, a multistage centrifugal pump coupled to a sealed motor, both hanging on the drop pipe with the power cable strapped alongside, or a line-shaft vertical turbine, whose bowls are down the well and whose motor is at the surface, driving them through a shaft in the column. A check valve above the pump holds the column full when the pump stops. A sounding tube or a transducer measures the water level. At the surface: the discharge head, a flow meter, a pump-to-waste valve and line, a sample tap, chemical injection, and the panel.
None of it can be seen. A submersible pulled for inspection is a crane, a crew, and a day. The controls are designed on the assumption that the pump will be protected by what the panel can measure, and that its condition will be inferred from trends rather than observed.
The start sequence
- 1
Call
From the tank level, the system pressure, or a schedule, through the permissives: water level above the cutoff, no fault, HOA in AUTO, minimum off time elapsed.
- 2
Pump to waste
The pump starts with the discharge directed to waste through a valve, or with the to-system valve closed and the waste valve open. The first minutes of pumping carry sand, turbidity, and air from the column and the screen. The period is a timer, typically two to fifteen minutes, or a turbidity measurement, or both.
- 3
Transfer to the system
The to-system valve opens, then the waste valve closes, in an order that never dead-heads the pump. Chemical feed starts with the flow.
- 4
Run
At fixed speed, or under pressure or flow control with a drive. Current, flow, pressure, and level are monitored against their expected values.
- 5
Stop
On the stop call, subject to minimum run time. On a drive, a slow ramp down lets the check valve close gently and the column settle; on across-the-line, a slow-closing valve or a surge relief handles the column.
- 6
Minimum off
The pump does not restart for a set time, typically several minutes, so the motor cools and the aquifer recovers.
Protections
| Protection | Signal | Setting and note |
|---|---|---|
| Low-water cutoff | A level transducer, a conductivity probe set above the pump intake, or an airline | Stops the pump when the pumping level nears the intake, with a restart above it after a delay. The single most important protection. |
| Fail to prove flow | Flow meter or discharge pressure | Pump running and no flow within 30 to 60 seconds: stop and alarm. Catches a broken shaft, a dropped pump, an air lock, a closed valve. |
| Overcurrent and undercurrent | Motor current from the starter or drive | High: a jammed or sanded pump, a failing motor. Low: a broken shaft or coupling, a pump running in air. Both against a baseline. |
| Phase monitoring | Phase monitor relay | Loss, reversal, imbalance, and undervoltage; reversal on a submersible runs it backward and unscrews some couplings. |
| Motor thermal | A thermal sensor where fitted, or a thermal model in the drive | Submersible motors depend on water flow past them for cooling; a thermal alarm at low flow is real. |
| Insulation resistance | A periodic test with power off | A submersible cable and motor that trend downward are on the way out. Test on a schedule and trend it. |
| Starts per hour | A counter in the controller | Large submersibles are limited to a handful of starts per hour and the cycle is designed around that. |
Drawdown and the aquifer
When a well pump runs, the water level in the casing falls from the static level to a pumping level, and the difference is the drawdown. The flow divided by the drawdown is the specific capacity of the well, in gallons per minute per foot, and it is the health measurement of the well itself. As a screen clogs with mineral scale or biological growth, the drawdown at a given flow increases and the specific capacity falls, over months and years. A controller that records the static level before each start, the pumping level after a set run time, and the flow, produces the specific capacity trend, and that trend tells the utility when to rehabilitate the well before it can no longer meet demand.
The pumping level also sets the low-water cutoff margin. A well whose pumping level has fallen toward the pump intake is a well whose cutoff will start tripping, and the response is well rehabilitation, a lower pump setting, or a reduced flow, not a lower cutoff setpoint.
Control modes
- Tank level
- The common mode: the well fills a ground or elevated tank, starting at a low level and stopping at a high level, with the band set for the well cycling limits. The tank level control page covers the setpoints.
- System pressure
- A well pumping directly into distribution, with a hydropneumatic tank or a drive holding pressure. Cycling is the risk; the tank or the drive minimum speed manages it.
- Flow control with a drive
- The well delivers a set flow to a treatment process or blends with other sources. The drive minimum speed and the pump curve down the well set the range; a submersible at low speed loses cooling flow.
- Schedule and rotation
- Multiple wells run in rotation to share the drawdown across the well field and to exercise every pump. The rotation logic is the lead/lag logic with wells as the pumps.
What to trend
- Static level, pumping level, flow, and the calculated specific capacity, per run and over years.
- Motor current and power against flow, for a sanded pump or a worn stage.
- Run hours and starts, against the motor limits.
- Pump-to-waste duration and the turbidity at transfer, for a screen that is shedding more.
- Insulation resistance from each test, for the cable and motor.
- Discharge pressure at a fixed flow, for a check valve or a column leak.
Frequently asked questions
- Why pump to waste at every start?
- The first water out of a well after the pump has been off carries sand and sediment that settled in the column and the screen, and air from the column. Sending it to the system delivers turbid water and fouls meters and chemical feed. A few minutes to waste, until a turbidity reading or a timer says the water is clear, is standard practice, and some regulators require it.
- How is a low-water cutoff set?
- From the pump setting and the manufacturer minimum submergence: the pump intake depth, plus the submergence required for cooling and to prevent vortexing, is the cutoff level. The transducer or probe is placed there, with a restart level enough above it that the well has recovered before the pump runs again.
- Should a well pump be on a drive?
- When the well is the source for a process that needs a controlled flow, or when pressure must be held without a large tank, yes. For a well that fills a tank, a drive adds cost and heat for little benefit, and a submersible at reduced speed can lose the cooling flow past its motor. Fixed speed with a soft starter for the column surge is common.
- What does a falling current with normal flow mean?
- Usually a worn pump: the impellers and bowls have lost clearance, the pump does less work at the same speed, and the flow will follow the current down. A sudden drop with no flow is a broken shaft or a dropped pump. Compare with the baseline and the flow.
Related topics
- Tank Level ControlHow a storage tank is filled and drawn on level setpoints, how the setpoints are chosen to keep the water turning over, and what the station does when the tank stops talking.
- Hydrostatic Level MeasurementMeasuring level from the pressure of the liquid above a sensor: submersible transducers, bubblers, and base-mounted transmitters, the density assumption behind all of them, venting, installation, and what makes them drift.
- Soft StartersReduced-voltage solid-state starters: how they ramp a motor, what they do for inrush, water hammer, and mechanical stress, where they beat a drive and where they do not, bypass contactors, and the settings that matter on a pump.
- Pump Runs But No FlowThe motor turns and nothing moves. How to tell a clogged impeller from an air-bound pump, a closed valve, a stuck check, a broken coupling, or reverse rotation, using motor current and discharge pressure before pulling anything.
- Distribution Pressure ControlHow a booster or high service pump station holds discharge pressure with variable speed pumps, how pumps are staged, and what stops the system hunting.
- Pump Will Not StartA pump that is called and does nothing. The order to check: permissives and mode, control power, the starter or drive, the motor circuit, and the pump itself, with the measurements that settle each one in minutes.