The short answer
Pump Sequencing Strategies
A sequencing strategy is the set of rules that decides which pumps run, at what speed, and when, and the right one for a station depends on what the station must do beyond moving water: keep the force main scoured, keep the wet well from going septic, keep grease from building up, keep starts within the motor rating, keep flow within a downstream limit, and survive a storm and a generator. The basic strategies are level bands with alternation for constant speed stations and a level loop with staging for drive stations; on top of them sit the routines that address the other concerns: a periodic full-speed run to scour the main, a skim cycle that draws the well down below the normal off level, an anti-ragging routine that reverses or restarts a pump whose current has risen, a minimum cycle frequency for septicity, a storm mode that changes the bands and the caps, and a generator mode that limits how many pumps start together. Each strategy has a failure and a recovery written into it, and each is tested by making the failure happen.
Key points
- Level bands with alternation, or a level loop with staging, are the base; the routines on top address scouring, septicity, grease, ragging, storms, and generators.
- A drive lead with constant speed lag pumps is a common and economical mix; the lead trims and the lag pumps hard.
- Pump-down operation keeps the well low and the cycle short; steady-flow operation holds a level and matches inflow; each has its place.
- Every routine has a trigger, a limit, and a way to end; a skim cycle that cannot end is a dry-running pump.
- Each strategy carries its failure response: a failed pump, a bad level signal, a lost link, a lost power, and the test proves it.
Base strategies
| Strategy | How it works | Suits |
|---|---|---|
| Level bands with alternation | Constant speed pumps on and off at fixed levels; the lead alternates each cycle | Most duplex and triplex stations |
| Level loop with staging | A drive lead holds a level band by speed; lag pumps stage in at full speed or at the same speed when the lead is at maximum | Stations with drives, flow limits, or series coordination |
| Drive lead, constant speed lag | One drive pump trims; the lag pumps run at full speed when called | Economical mix at medium stations |
| First on, first off | For three or more pumps: the pump that started first stops first | Triplex and larger |
| Runtime balancing | The pump with the fewest hours leads at the next cycle | Controller stations wanting balanced wear |
Pump-down or steady-flow
Pump-down operation draws the well from lead-on to off on each cycle at full capacity, keeps the well low most of the time, keeps the detention short, and scours the main on every cycle; it is the natural mode of a constant speed station and it costs starts. Steady-flow operation holds the level in a band with a drive and sends a flow near the inflow, which is gentle on the main and the downstream plant and good for flow matching; it costs a periodic scouring run and, if the speed sits low, a ragging risk. Many drive stations run steady-flow by day and a pump-down cycle at intervals; the strategy is written down and the reasons with it.
The routines
- Scouring run
- On a drive station, a full-speed run of set duration at intervals, or whenever the average velocity in the main has been below the scouring velocity for a set time, to move settled solids. The velocity is computed from the flow and the main diameter; two feet per second is the usual target.
- Skim cycle
- A pump-down below the normal off level to the minimum submergence, on a schedule, to draw floating grease and rags into the pump; ends on level, on time, or on a current rise, whichever comes first, and never runs with the level signal in doubt.
- Anti-ragging
- When a pump current rises above its normal for the level, the routine stops the pump, optionally runs it in reverse for a few seconds where the drive and the pump allow it, and restarts; a set number of attempts, then a fault. The current trend is the detection.
- Minimum cycle frequency
- If the level has not reached lead-on within a set time, a pump runs the well down anyway to limit detention and septicity; the time comes from the sulfide and odor history.
- Starts limiting
- If starts per hour approach the motor rating, the bands widen automatically within limits and an alarm is raised; a stuck float or a drifting transmitter usually explains it.
- Storm mode
- On a plant or rainfall trigger, the bands and caps change to the wet weather plan values: more storage used, flow caps applied or released, the lag brought in later or sooner according to the plan.
- Generator mode
- On generator power, only one pump starts at a time with a stagger, the drive ramp lengthens, and the number of pumps allowed may drop to what the generator carries.
v = Q ÷ A = Q (gpm) × 0.408 ÷ d² (inches)
- v = velocity in feet per second in the force main
- Q = flow in gallons per minute
- d = force main inside diameter in inches
- A scouring velocity of about 2 feet per second is the usual minimum; the design states it
Failure and recovery
| Failure | Strategy response |
|---|---|
| Pump fault | Promote the next pump at once; alarm; hold the failed pump out until reset |
| Level transmitter bad | Fall back to floats through the backup circuit; alarm; suspend routines that depend on level accuracy |
| Drive fault | Run the pump across the line through the bypass if fitted, or promote a constant speed pump; alarm |
| Communication loss | Hold external setpoints for a set time, then local bands; alarm |
| Power loss and return | Staggered restart in generator mode; routines resume after a delay |
| Routine stuck | Every routine has a timeout that returns the station to base control and alarms |
Frequently asked questions
- How often should a scouring run happen?
- When the computed main velocity has been below the scouring value for a set period, often a few hours, or on a fixed interval where the flow is not computed. A main that is scoured on every pump-down cycle needs no separate routine.
- Is reversing a pump to clear rags safe?
- Only where the pump and drive manufacturers allow it, with a short duration and a limited number of attempts; many submersibles must not be reversed. Where it is not allowed, a stop and restart sequence often clears the impeller, and the current trend decides whether it worked.
- Can the skim cycle run automatically at night?
- Yes, on a schedule, with the level signal validated, the minimum submergence as the end point, a time limit, and a current rise as an abort. It is a routine that must be able to stop itself; a pump that runs dry because a skim cycle lost its level signal is the failure to design against.
- Should a drive station ever run at full speed?
- Regularly: for scouring, for the skim cycle, and whenever the inflow demands it. A drive station that never runs at full speed has a settling force main and a ragging pump within a season.
Related topics
- Constant Speed Pump ControlOn and off pumping with constant speed pumps: why it remains the right answer at most lift stations, the level bands and the wet well volume that set the cycle, starts per hour and motor limits, and the cases where variable speed is worth its cost.
- VFD Pump Control in WastewaterThe control modes for a variable speed wastewater pump: level control, flow pacing, fixed speed with soft start, and drawdown modes, plus the wastewater-specific rules: minimum speed, ragging at low speed, force main velocity, and the periodic full-speed run.
- Station Flow ControlControlling the flow a lift station sends downstream: why a station would limit or match its flow, the plant hydraulic limit, the force main capacity, equalization, and wet weather, and the alarms.
- Lift Station Pump AlternationWhich pump leads, how the lead role rotates, what an alternator relay does, and why equal run hours are not always the goal. Includes the logic rules that keep alternation from causing trouble.
- Lift Station Generator OperationStandby power at a lift station: what the transfer switch does, how the controls ride through the transfer, staggered pump restarts, what SCADA should see, load testing, and the portable generator connection.
- AlternationPump alternation at the panel level: what it is for, the alternator relay against controller logic, schemes from alternate-every-cycle to runtime balancing, manual lead selection, skipping a failed pump, alternation in the backup circuit, and the tests.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.