Getting a remote station onto the SCADA system and keeping it there: which signals to bring back and which controls to allow, the telemetry path from licensed radio to cellular to fiber, and the maintenance that keeps the link up.

9 min readUpdated Sep 5, 2026Published Sep 5, 2026By Eric Sullivan

The short answer

Lift Station SCADA

A lift station on SCADA is a station whose runs, faults, level, and alarms reach the operators within seconds, whose history shows when a pump is failing before it fails, and whose controls can be adjusted from the plant without a drive to the site, over a link that is monitored, secured, and maintained like the pumps. The design decides what comes back, which is more than the alarms; what can be sent, which is less than everything; how the data travels, licensed radio, unlicensed spread spectrum, cellular, or fiber, each with its own polling model; how the controller packages its data in a compact block with a watchdog word; how alarms are prioritized and who is called; and how the site is kept separate from everything it does not need to talk to. Commissioning proves each signal end to end, and keeping the station on SCADA is a matter of watching the communication statistics, the radio signal, and the alarm response, and fixing the first degradation rather than the eventual silence.

Key points

  • Bring back everything that describes the station: runs, faults, level, flow, power, generator, selector positions, seal and thermal, intrusion, and a watchdog.
  • Allow only the controls that are safe from a distance: setpoints within limits, fault reset, and a supervised start; never a bypass of a safety.
  • Pick the telemetry path for the site and poll it accordingly: radio by poll, cellular by exception or keepalive, fiber like a plant network.
  • Design alarms with priorities and callouts; a station that pages on every event is a station nobody answers.
  • Watch the link: communication statistics, signal strength, and retries trend down before the site goes silent.

What comes back

SignalTypeWhy
Pump running, per pumpDiscreteRun status, runtime, starts per hour
Pump fault, per pumpDiscrete, latchedOverload, phase, thermal, seal; the reason is in the fault word
Selector position, per pumpDiscreteA pump left in hand or off is the commonest hidden failure
Wet well levelAnalogThe process variable; the rate of change is the inflow
Level setpointsAnalog, read and writeLead on, lag on, off, high alarm
FlowAnalog, where meteredPermit, capacity, and inflow and infiltration studies
Pump current or powerAnalog, where measuredA rising current at constant level is a ragging pump
High level, from the independent floatDiscreteThe overflow warning that does not depend on the transmitter
Power fail, generator running, transfer switch positionDiscreteOutage response
Intrusion, door openDiscreteSecurity and safety
Backup mode activeDiscreteThe controller has handed the station to the floats
Watchdog wordIntegerChanges every second; a stale word is a dead link or a dead controller
Communication statisticsFrom the driverSuccess rate, retries, signal strength

What can be sent

  • Level setpoints within engineering limits enforced in the controller, with the change logged.
  • A fault reset, which clears the latch only if the fault condition is gone.
  • A supervised pump start or stop for a test, with a timeout that returns the pump to automatic.
  • A lead pump selection, logged, with an expiry.
  • Never: a bypass of a safety, a level cutoff override, or anything that leaves the station in a state that needs a person to restore.

The path

PathPolling modelStrengthsWatch for
Licensed radioMaster polls each site in turn; slow but deterministicNo recurring cost, long range, ownedPath margin, antenna systems, interference, the license
Unlicensed spread spectrumPolled; faster data rates over shorter pathsNo license, higher speedInterference from others, foliage, range
CellularException reporting or a keepalive; the site initiates or holds a tunnelAnywhere with coverage; fastData plan, coverage, the carrier changing things, security of the public path
Fiber or private EthernetLike a plant networkFast, immune to weatherCost; cuts by excavation
Leased line or point-to-point microwaveVariesEstablishedAging equipment; cost

At the controller

The station controller packs its status into a contiguous block of registers: the discrete signals as bits in a few words, the analogs as integers or floats, the setpoints in a writable block, and the watchdog word. SCADA reads the block in one or two polls and writes the setpoint block when a change is made. Alarms are generated in the controller, so that a loss of communication produces one communication alarm rather than a flood of stale ones, and the controller holds its alarm state through the outage and reports it on reconnection. For cellular and any protocol that supports it, events with time stamps are buffered at the site and forwarded, so that a pump start during an outage is recorded at the right time.

Alarms and callouts

Priority
High level, both pumps failed, power fail without generator, and communication loss on a critical station are urgent; a single pump fault at a duplex is high; a selector in hand for an hour is medium; a door open is low outside business hours. The philosophy states it.
Callout
Urgent alarms go to the on-call phone with escalation; high alarms go to the on-call phone in business hours and escalate after a delay otherwise; the rest wait on the screen.
Delay and deadband
A level alarm needs a few seconds of persistence; a communication alarm needs a few missed polls on radio and a longer window on cellular.
Acknowledgment
Alarms are acknowledged in SCADA, logged with who and when, and reviewed weekly for standing alarms.
  • Runtime per cycle increasing at constant inflow: a pump losing capacity, a ragged impeller, or a check valve leaking.
  • Starts per hour rising: a level band that has drifted, a float sticking, or an inflow change.
  • Current at constant level rising: ragging or a bearing.
  • Level rate of fall during a pump run: the delivered flow; a change is a pump or force main problem.
  • Communication success rate falling, retries rising, signal weakening: the link is failing before it fails.
  • Inflow at night above the historical minimum: infiltration.

Security at the site

The station is a remote door into the control system. A cellular router with a public address and a default password is the classic breach; the design puts the site behind a firewall or a private cellular network, reaches it through a virtual private network with strong authentication, segments the radio or router from the drives and the controller by a firewall or the controller second port, disables every service the site does not use, changes every default credential, and keeps the firmware in the patch program. Physical security, a locked panel with intrusion reporting, is part of it.

Commissioning

  1. 1

    Point to point

    Every discrete and analog signal exercised at the site and confirmed on the SCADA screen with its label, its units, and its alarm.

  2. 2

    Setpoint writes

    Each writable setpoint changed from SCADA, confirmed at the controller, and the limits tested.

  3. 3

    Alarm test

    Each alarm raised at the site, seen on the screen with the right priority, and the callout received.

  4. 4

    Communication loss

    The link broken; the communication alarm arrives; the station runs on its own; the link restored and the data, including buffered events, returns.

  5. 5

    Power loss

    The site power dropped; the power fail alarm arrives over the UPS-backed link; the generator sequence reported.

  6. 6

    Backup mode

    The controller failed or the transmitter disconnected; the backup floats run the station; SCADA shows backup active.

  7. 7

    Record

    The signal strength, the success rate, the configuration, and the screen captures in the site record.

Frequently asked questions

How many signals is too many for a radio site?
A packed block of a few dozen words carries everything above in one poll; the constraint is the poll cycle across all sites, not the size of one. Bring back what describes the station and pack it well.
Should operators be able to start a pump from SCADA?
A supervised start with a timeout, for testing, is reasonable at a station where the risk is understood; a continuous remote hand mode is not. The station must always return itself to automatic.
Radio or cellular for a new station?
Radio where the utility owns a system with a path to the site and no recurring cost; cellular where coverage is good, the site is beyond the radio system, and the security design is in place. Many utilities use cellular as the second path at critical stations.
Why does the station show a communication alarm every night?
A path that loses margin at night, from temperature inversion on a radio path or from carrier congestion on cellular, or a poll timeout set too short for the night conditions. The retry statistics by time of day name it.

Direct contact

Have a controls question?

Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.