The short answer
Lift Station Pump Alternation
Alternation rotates the lead role among the pumps in a lift station so wear is shared and every pump is exercised. The rotation usually advances at the end of each pump cycle, only among pumps that are available in auto, and is stored in retentive memory so it survives a power cycle. It can be done by a dedicated alternator relay or in the PLC, and a selector switch lets the operator fix the lead when one pump needs to be favored or rested.
Key points
- Alternate at the all-off event, never in the middle of a cycle.
- Only pumps that are available and in auto take part in the rotation.
- Store the lead designation in retentive memory so a power loss does not reset it.
- Equal run hours are common but not mandatory. Some utilities stagger wear deliberately.
- Uneven run hours on the SCADA report are the first sign alternation has quietly stopped working.
Why the lead role rotates
If the same pump always led, it would accumulate most of the run hours while the other sat idle. The idle pump is the problem. Grit settles in its volute, its seal faces dry, its bearings take a set, and the first time it is needed in a storm it turns out not to work. Alternation makes both pumps run routinely, so a failure is found on an ordinary Tuesday instead of during the event the standby was bought for.
Sharing wear is the second reason and the one most people name first. Equal run hours mean the pumps age together, which simplifies maintenance planning, but it also means they reach the end of life together. Some utilities set the alternation ratio so one pump carries a larger share, for instance sixty percent, so that replacements fall in different budget years and the station never has two tired pumps at once. Either approach is defensible; the point is to choose it rather than inherit it.
Alternation schemes
| Scheme | How it works | Where it fits |
|---|---|---|
| Alternate every cycle | The lead role advances each time the station reaches all-off. | The default for duplex and triplex stations with identical pumps. |
| Alternate on time | The lead changes on a schedule, such as daily at a fixed hour, or after a set number of run hours. | Stations where cycles are very short or very long, or where an operator wants a predictable pattern. |
| Run-hour balancing | The pump with the fewest hours is chosen as lead at each cycle. | Triplex and larger stations, and stations where a pump has been out of service and needs to catch up. Requires accurate run-hour accumulation. |
| Fixed lead | One pump is always lead; the other is standby only. | Unequal pumps, a pump on a temporary repair, or a jockey pump arrangement. Exercise the standby on a schedule if it is fixed for long. |
| First-on, first-off | When both pumps run, the one that started first stops first at lag-off. | A refinement that shares run time within a two-pump cycle, common in PLC implementations. |
The rules that keep alternation safe
Alternation is simple in principle and produces surprising behavior when the edge cases are not handled. These rules cover the ones that matter.
- 01Advance the lead only at all-off, when no pump is running. Swapping roles while the lead is running turns a lag call into a confusing stop-and-start, and with both pumps running it can stop both.
- 02Skip any pump that is not available. Not in auto, faulted, locked out, or failed to prove all remove a pump from the rotation until it is available again. With one pump available, that pump is lead every cycle, and the loss of redundancy is alarmed.
- 03Keep the lead designation in retentive memory. A controller that boots with pump 1 as lead every time will favor pump 1 after every power event, and remote stations have many power events.
- 04Provide a manual override. A three-position selector, 1-2, ALT, 2-1, or an equivalent SCADA setting, lets an operator fix the lead while a pump is nursed along or after a repair. The override should be visible on the HMI and alarmed if left in place for more than a set period.
- 05Handle a lead pump that fails to prove by promoting the other pump immediately. This is covered under lead/lag; the alternation logic must not fight it by advancing the rotation back to the failed pump.
- 06Count starts and run hours per pump in the controller, not only in SCADA. The counts are the evidence that alternation is working.
Alternator relays
Before PLCs, and still in many small stations, alternation is done by a dedicated alternator relay. The common form is an impulse or ratchet relay: each time its coil is pulsed by the all-off event, its contacts transfer, steering the lead-on float to the other starter. Solid-state duplex alternators combine the ratchet, the lead and lag float inputs, and sometimes a selector switch into one module.
Alternator relays are reliable and easy to understand at three in the morning, which is a real virtue. Their limits are that they know nothing about pump availability unless the panel is wired to skip a pump that is not in auto, and that a stuck ratchet gives one pump every cycle with no alarm. When a PLC is added to a station that already has an alternator, decide which one is in charge. Two alternators, one in relay logic and one in the program, will disagree.
(* Advance the lead only at all-off, and only when both pumps can take it. *)
IF All_Off_Event AND P1_Available AND P2_Available AND Selector_Auto THEN
Lead_Is_P2 := NOT Lead_Is_P2; (* retentive bit *)
END_IF;
(* Selector overrides: 1-2 fixes P1 as lead, 2-1 fixes P2. *)
IF Selector_1_2 THEN Lead_Is_P2 := FALSE; END_IF;
IF Selector_2_1 THEN Lead_Is_P2 := TRUE; END_IF;
(* A pump that is not available never leads. This rule wins over the selector. *)
IF NOT P1_Available THEN Lead_Is_P2 := TRUE; END_IF;
IF NOT P2_Available THEN Lead_Is_P2 := FALSE; END_IF;
(* The lead answers the lead call; either pump answers the lag call. *)
P1_Call := P1_Available AND ((Lead_Call AND NOT Lead_Is_P2) OR Lag_Call);
P2_Call := P2_Available AND ((Lead_Call AND Lead_Is_P2) OR Lag_Call);The order of the three rule groups is deliberate. The availability rule comes last so that a selector left on a failed pump cannot leave the station with no lead. Lead_Is_P2 lives in retentive memory. All_Off_Event is a one-scan pulse generated when the last running pump stops, not the all-off level itself, so the toggle fires once per cycle.
Triplex and larger stations
With three pumps the rotation is a sequence rather than a swap: lead, lag, and standby roles advance one step at each all-off event, so each pump takes each role in turn. Run-hour balancing becomes more attractive here because the standby role otherwise gets no hours at all during dry weather. The availability rule generalizes: build the ordered list of available pumps, then assign lead, lag, and second lag down the list from the current rotation point.
When alternation stops working
Alternation fails silently. The station keeps pumping with one pump, and nobody notices until the run-hour report shows pump 1 at 4,000 hours and pump 2 at 900, or until pump 2 is finally called in a storm and does not start. Look for these causes.
| Symptom | Likely cause | Check |
|---|---|---|
| One pump has most of the hours | Selector left in a fixed position; other pump not in auto; alternator ratchet stuck; alternation advancing on a condition that never occurs | Selector position and HOA positions on site; alternator contacts; the all-off event bit in the program |
| Lead changes mid-cycle | Alternation keyed to a level or timer event rather than all-off | Trend both run statuses against level; the swap shows as a stop-and-start |
| Both pumps start together every cycle | Lag call not conditioned on the lead role, or lag-on setpoint at or below lead-on | Setpoints; the lag call logic |
| Rotation resets after power loss | Lead bit not retentive | Controller memory configuration; test by cycling control power |
| Pump 2 never runs, alarm never sounds | No unavailable-pump alarm, and pump 2 not in auto for months | Add the alarm; review HOA status on SCADA |
Frequently asked questions
- Does alternation increase the number of starts?
- No. The station starts the same number of times for a given inflow. Alternation divides those starts between the pumps instead of putting them all on one motor. Starts per pump roughly halve.
- Should the alternator be in the PLC or a separate relay?
- Put it in one place. A PLC gives availability logic, retentive memory, counters, and SCADA visibility. A relay alternator is simpler and works with the PLC removed, which matters in a float backup scheme. A common compromise is the PLC in charge normally, with the relay alternator active only in backup mode when the PLC watchdog has dropped out.
- How do I alternate pumps that are different sizes?
- Do not. Fix the small pump as lead, use the large pump for lag and as standby, and exercise the large pump on a schedule so it is proven. Alternating unequal pumps gives a station whose capacity and cycle times change every cycle.
- The pumps are alternating but run hours are still uneven. Why?
- Check whether one pump is consistently the lag. In a strict every-cycle scheme the lag role also alternates, but with a first-on, first-off stop sequence or a run-time based lag call, one pump can end up taking most of the two-pump time. Also check that one pump is not being held out of auto for part of each day by a maintenance routine.
Related topics
- Lift Station Lead/Lag ControlHow a duplex or triplex station decides when one pump is enough and when it is not: the setpoint ladder, cycle volume, the lag call, parallel pumping, and what to do when the lead pump fails.
- Lead/Lag Pump ControlWhich pump runs first, when the second joins, how they trade places, and the design decisions that determine whether a duplex station wears evenly.
- Retentive MemoryWhat survives a power cycle in a controller and what does not, how retention is backed up by battery, capacitor, or nonvolatile storage, what should be retentive, and how retained data gets lost.
- Hand-Off-Auto SelectorsWhat each position of an HOA selector does, how it is wired into the starter circuit, which protections must survive Hand, what the controller should see, and the mistakes that let a pump run with nobody watching.
- How to Program Lead/Lag Pump ControlBuild duplex pump control with alternation, failure detection, minimum run and off timers, and an operator override that survives a restart.
- Duplex Lift Station ControlsThe two-pump station that makes up most of a collection system: what is in the panel, how the sequence works, what is monitored, and where these stations actually fail.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.