The short answer

Lift Station Backup Control

Backup control is the layer of a lift station panel that runs the pumps when the primary controller cannot. It is built from floats and relays: a backup-start or high-level float calls the pumps through relay contacts that parallel the controller outputs, a redundant-off float stops them, and a control transfer relay driven by the PLC watchdog hands control to the floats when the controller fails. It is simpler than the primary system by design and is proven by testing with the primary disabled.

Key points

  • Backup control must be simpler than, and independent of, what it backs up.
  • A control transfer relay driven by the PLC watchdog is the cleanest hand-off between primary and backup.
  • Backup mode needs its own low-level protection. A redundant-off float in the run path prevents dry running.
  • Feed the backup relays from control power directly, not from the PLC 24 V supply.
  • Backup that has never been tested with the PLC dead is a drawing, not a backup.

What backup control is for

The primary control at a lift station is a level transmitter feeding a PLC or RTU that runs the lead/lag sequence. Each element in that chain can fail: the transmitter can foul or drift, the analog input can die, the processor can fault, the program can be corrupted by a download gone wrong, and the 24 V supply feeding all of them can quit. Backup control is the arrangement that keeps the well from overflowing while any of those is true.

The design principle is independence. Backup does not use the transmitter, does not depend on the processor, and ideally does not depend on the same power supply. It uses floats, which are switches, and relays, which are switches driven by switches. It is deliberately dumb, because a dumb system has few ways to fail and its failures are visible.

The layers

FailureWhat the station losesWhat covers it
Level transmitter fouled, drifted, or deadContinuous level; the primary sequence acts on a wrong valueSignal validation in the PLC, then float operation through the PLC when it gives up on the transmitter
Analog input cardContinuous levelSame: floats through the PLC if the processor is alive, through relays if it is not
PLC processor faulted or powered offThe whole sequenceControl transfer relay drops out; floats run the pumps through relay logic
PLC 24 V supplyTransmitter, inputs, processorRelay logic on control transformer power, not on the PLC supply
SCADA communicationsRemote visibility and alarmsNothing in the pump control depends on SCADA; local alarm and autodialer cover notification
Site powerEverythingGenerator and transfer switch; a power backup rather than a control backup, covered on its own page
Both pumpsPumpingPortable pump connection and bypass; a control matter only in that the panel must be able to run a portable pump
What fails and what covers it

Float backup logic

The minimum float set for backup is three floats: a redundant-off float, a backup-start float, and the high-level float. Many stations add a lead-start float so that backup mode has its own lead and lag. The floats operate relays, and the relay contacts are wired in parallel with the controller outputs in the starter control circuits, so either the PLC or the floats can close the pump call.

  1. 1

    Backup start

    The backup-start float closes on rise and picks a start relay. Through the control transfer relay contacts, the start relay calls the pumps. A relay alternator can share the duty; without one, backup mode calls both pumps, which is acceptable for a mode that is supposed to be rare.

  2. 2

    Seal-in

    The start relay seals in through its own contact and the redundant-off float, so the pumps keep running as the level falls below the start float.

  3. 3

    Backup stop

    The redundant-off float opens on fall and drops the seal-in. The pumps stop. This float is set at or slightly above the primary all-off setpoint, and it is the only thing in backup mode that stops the pumps.

  4. 4

    High level

    The high-level float calls the pumps through the same path and raises the alarm, so it acts as a second backup start if the backup-start float has failed.

  5. 5

    Low-level cutoff

    Where the station has a separate low-level float, it opens the run path in every mode, primary and backup, so a controller fault and a float fault together still cannot run a pump dry.

Backup run path, drawn as a ladder
   CTR (PLC       Backup-Start                                       CR1
   healthy)       Float                                            Backup Run
|----]/[------+------] [------+---------------------------------------( )----|
|             |               |                                              |
|             |   CR1   Redundant-Off Float                                   |
|             +---] [------] [-+                                              |
|                 (seal-in: holds until the well is pumped down)              |

   CR1          HOA in AUTO    Low-Level Cutoff                       M1
|---] [----+-------] [--------------] [--------------------------------( )----|
|          |                                                                  |
|  PLC     |                                                                  |
| Out 1    |                                                                  |
|---] [----+                                                                  |
   (either the controller or the backup relay can call the pump)

The high-level float is not shown; it parallels the backup-start float. The figure shows the two ideas that matter: the backup path is enabled only when the PLC is not healthy, and the backup path stops on a float that the PLC has nothing to do with.

The control transfer relay

The cleanest way to hand control between primary and backup is a single relay driven by a PLC output that the program holds on while it is running correctly. The output is the watchdog. If the processor faults, stops scanning, loses power, or is put into program mode, the output drops, the relay de-energizes, and its contacts transfer the pump call path from the PLC outputs to the float relays.

Some designs leave the float path always enabled rather than transferring it, so the floats can call the pumps at any time in parallel with the PLC. That is simpler and it works, but it has a side effect: a float that trips during normal operation quietly overrides the sequence, the PLC does not know why the pumps are running, and a failed-closed float runs the pumps continuously until the redundant-off float stops them. With a transfer relay, the floats are read by the PLC as inputs during normal operation and alarmed if they disagree with the transmitter, and they only take charge when the PLC is gone.

Power for the backup

Feed the backup relays and the floats from the panel control transformer, on their own fused circuit, not from the 24 V DC supply that feeds the PLC. If the PLC supply fails, the backup must not fail with it. Where the floats are intrinsically safe, the barrier or relay must also be on that circuit. If the entire control circuit is 24 V DC, use two supplies with the backup relays on the second, or at least a separate branch of the first with its own fuse, and record the shared failure as a known limitation.

Testing backup control

A backup that has never taken over has not been proven. Test it at commissioning, after any change to the panel or the program, and annually.

  1. 6

    Announce the test

    Tell the SCADA operators, and make sure the well has room. The well will rise to the backup-start float during the test.

  2. 7

    Confirm the starting state

    Pumps in AUTO, PLC running, floats hanging free. Note the level.

  3. 8

    Kill the primary

    Put the PLC in program mode or pull its power. Confirm the control transfer relay drops and the backup-mode alarm reaches SCADA or the dialer.

  4. 9

    Let the well rise

    Or lift the backup-start float by hand from the hatch. Confirm the pumps start.

  5. 10

    Let it pump down

    Confirm the pumps stop on the redundant-off float and not before. Lower the float by hand if the well cannot be pumped that low during the test.

  6. 11

    Test the high-level float

    Lift it. Confirm the alarm and the pump call.

  7. 12

    Restore the primary

    Return the PLC to run mode. Confirm the transfer relay picks up, the backup relays drop out, the sequence resumes on the transmitter, and the alarms clear. Record the test with the date, the tester, and the levels observed.

Frequently asked questions

Is a second PLC better than floats for backup?
A second PLC needs a level signal, a program, and a power supply, so it shares more failure modes with the primary than floats do, and it has to be kept in step with every program change. It is the right answer for large stations where backup mode needs real lead/lag and alarming. For a typical duplex station, floats and relays give better independence for far less complexity.
Can the backup be a dedicated pump controller with its own floats?
Yes, and packaged float-backup controllers exist for exactly this. Treat them as relay logic in a box: check that they run on control transformer power, that they take over on a watchdog or transfer contact rather than fighting the PLC, and that they stop on a float you can test.
Should backup mode alternate the pumps?
It is nice to have and not necessary. Backup mode is a rare state that should end when someone arrives. A relay alternator in the backup path is inexpensive if the panel is being built; adding one to an existing panel is rarely worth the wiring change. Calling both pumps on the backup-start float is acceptable.
What if the transmitter fails but the PLC is fine?
That is the more common case, and it is handled in the PLC: the signal validation logic detects the bad signal, alarms it, and the program falls back to running the sequence on the float inputs it already reads. The relay backup is for the case where the PLC itself cannot do that.