The short answer
How to Configure Alarms
To configure alarms, work from the rationalized alarm list, not from the tag browser: for each alarm, decide whether the condition comes from the controller as a bit or is evaluated in SCADA against limits, set the limits, deadband, and on delay the list specifies, assign the priority and write the message so that it names the equipment, the condition, and the action, put the alarm in the area that routes it to the right operators, configure acknowledgment, shelving, and suppression per the philosophy, and connect the notification roster for the priorities that call out. Test every alarm by forcing its condition and confirming the annunciation, the message, the log, and the callout, then watch the alarm rate and the standing alarms for a month and fix what the numbers show.
Key points
- The alarm list is the input; an alarm not on the list is not configured.
- Prefer controller-generated conditions; SCADA-evaluated limits are for values the controller does not own.
- Every alarm has a priority, a deadband, a delay, a message with the action, and an area.
- Notification follows the priority and the roster; test the callout, not just the screen.
- Review rates and standing alarms after go-live; the configuration is not done until the numbers are acceptable.
What you need
- The rationalized alarm list with priorities, limits, deadbands, delays, and operator actions
- The alarm philosophy document
- The SCADA alarm configuration tool and the notification system
- The on-call roster and contact details
- A way to force each condition: controller simulation or field test
Procedure
- 1
Start from the list
Each row of the alarm list becomes one alarm. If the list is missing or old, rationalize first; configuring from the tag browser produces the flood you are trying to avoid.
- 2
Choose the source
A controller alarm bit for anything the controller evaluates, which is most process and equipment alarms; a SCADA-evaluated limit for values the controller does not own, such as a server disk or a communication statistic.
- 3
Set the condition
For SCADA-evaluated alarms: the limits, the deadband, and the on and off delays from the list. For controller alarms: confirm the controller block has the same values.
- 4
Set the priority
From the list, using the philosophy scale, usually three or four levels. Priority drives color, sound, ordering, and notification; it is not decoration.
- 5
Write the message
Equipment, condition, and action: Lift station 12 wet well high level; check pumps and inflow. The message is what the operator reads at three in the morning.
- 6
Assign the area
The plant area or site that routes the alarm to the operators and screens responsible for it, and the group used for filtering.
- 7
Configure behavior
Acknowledgment required or not, shelving permitted and for how long, suppression by design state, and the alarm return-to-normal handling, per the philosophy.
- 8
Connect notification
The roster and escalation for the priorities that call out, with the delay before callout and the acknowledgment method.
- 9
Test each alarm
Force the condition: the alarm appears with the right priority, message, and area; the log records it; the callout arrives; the acknowledgment clears it; the return to normal behaves. Record the test.
- 10
Review after go-live
Alarms per operator per hour, the ten most frequent, standing alarms, and chattering alarms, weekly for the first month; fix limits, deadbands, and delays, and remove alarms nobody acts on.
| Setting | Source | Note |
|---|---|---|
| Limit | Alarm list | Engineering units; matched in the controller block |
| Deadband | Alarm list | Prevents chatter at the limit |
| On delay | Alarm list | Filters transients; seconds to minutes by alarm |
| Priority | Alarm list and philosophy | Drives notification |
| Message | Written per alarm | Equipment, condition, action |
| Area | Plant structure | Routing and filtering |
| Shelving | Philosophy | Time limited; logged |
| Notification | Roster | By priority; escalation |
Frequently asked questions
- Controller alarm or SCADA alarm?
- Controller for anything about the process or equipment: it is evaluated every scan, survives a SCADA outage, and drives interlocks. SCADA for the system health items the controller cannot see. Both appear in the same alarm system.
- How many priorities?
- Three or four: urgent, high, medium, low, or similar. More than four cannot be distinguished by an operator under load.
- What alarm rate is acceptable?
- The commonly cited targets are on the order of one or two alarms per operator per ten minutes on average, and a flood is more than ten in ten minutes. Rates above that mean rationalization was skipped or the limits are wrong.
- Should every alarm call out?
- No. Urgent and high call out per the roster; medium and low wait for the screen. A pager that goes off for a door open at noon is a pager that gets ignored at midnight.
Related topics
- ISA-18.2 Alarm ManagementThe lifecycle standard for alarm systems, the rate targets that define a workable system, and why alarm rationalization is the step nobody wants to fund.
- Alarm RationalizationThe meeting where every alarm earns its place: who attends, what is decided for each alarm, how to document it in a master alarm database, and how to run it at a utility that cannot spare a week.
- Alarm PriorityHow to assign alarm priorities that operators trust: a consequence-and-time matrix, three or four levels, the target distribution from ISA-18.2 and EEMUA 191, and the mistakes that make every alarm high.
- Alarm Notification and CalloutGetting the alarm to the person on call when no one is watching the screen: notification paths, escalation, acknowledgment from the field, which alarms qualify, and the failure modes that leave a station in high level with nobody paged.
- Alarms in the ControllerGenerating alarm conditions in the controller rather than in the graphics: why the PLC should own the alarm state, a standard alarm block with setpoints, deadband, and delays, equipment alarms, and packing alarm bits for SCADA.
- How to Add an AlarmFrom a request to a working alarm: define it against the philosophy, build the condition in the PLC with deadband and delays, configure the SCADA alarm with priority and message, test it end to end, and record it in the master alarm database.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.