How to Configure Alarms

Configure alarms in the SCADA system from the alarm list: set the source, controller-generated or evaluated in SCADA, the limits and deadband and delay, and the notification; then test each alarm end to end and review the alarm rate after the first weeks.

8 min readUpdated Sep 5, 2026Published Sep 5, 2026By Eric Sullivan

The short answer

How to Configure Alarms

To configure alarms, work from the rationalized alarm list, not from the tag browser: for each alarm, decide whether the condition comes from the controller as a bit or is evaluated in SCADA against limits, set the limits, deadband, and on delay the list specifies, assign the priority and write the message so that it names the equipment, the condition, and the action, put the alarm in the area that routes it to the right operators, configure acknowledgment, shelving, and suppression per the philosophy, and connect the notification roster for the priorities that call out. Test every alarm by forcing its condition and confirming the annunciation, the message, the log, and the callout, then watch the alarm rate and the standing alarms for a month and fix what the numbers show.

Key points

  • The alarm list is the input; an alarm not on the list is not configured.
  • Prefer controller-generated conditions; SCADA-evaluated limits are for values the controller does not own.
  • Every alarm has a priority, a deadband, a delay, a message with the action, and an area.
  • Notification follows the priority and the roster; test the callout, not just the screen.
  • Review rates and standing alarms after go-live; the configuration is not done until the numbers are acceptable.

What you need

  • The rationalized alarm list with priorities, limits, deadbands, delays, and operator actions
  • The alarm philosophy document
  • The SCADA alarm configuration tool and the notification system
  • The on-call roster and contact details
  • A way to force each condition: controller simulation or field test

Procedure

  1. 1

    Start from the list

    Each row of the alarm list becomes one alarm. If the list is missing or old, rationalize first; configuring from the tag browser produces the flood you are trying to avoid.

  2. 2

    Choose the source

    A controller alarm bit for anything the controller evaluates, which is most process and equipment alarms; a SCADA-evaluated limit for values the controller does not own, such as a server disk or a communication statistic.

  3. 3

    Set the condition

    For SCADA-evaluated alarms: the limits, the deadband, and the on and off delays from the list. For controller alarms: confirm the controller block has the same values.

  4. 4

    Set the priority

    From the list, using the philosophy scale, usually three or four levels. Priority drives color, sound, ordering, and notification; it is not decoration.

  5. 5

    Write the message

    Equipment, condition, and action: Lift station 12 wet well high level; check pumps and inflow. The message is what the operator reads at three in the morning.

  6. 6

    Assign the area

    The plant area or site that routes the alarm to the operators and screens responsible for it, and the group used for filtering.

  7. 7

    Configure behavior

    Acknowledgment required or not, shelving permitted and for how long, suppression by design state, and the alarm return-to-normal handling, per the philosophy.

  8. 8

    Connect notification

    The roster and escalation for the priorities that call out, with the delay before callout and the acknowledgment method.

  9. 9

    Test each alarm

    Force the condition: the alarm appears with the right priority, message, and area; the log records it; the callout arrives; the acknowledgment clears it; the return to normal behaves. Record the test.

  10. 10

    Review after go-live

    Alarms per operator per hour, the ten most frequent, standing alarms, and chattering alarms, weekly for the first month; fix limits, deadbands, and delays, and remove alarms nobody acts on.

SettingSourceNote
LimitAlarm listEngineering units; matched in the controller block
DeadbandAlarm listPrevents chatter at the limit
On delayAlarm listFilters transients; seconds to minutes by alarm
PriorityAlarm list and philosophyDrives notification
MessageWritten per alarmEquipment, condition, action
AreaPlant structureRouting and filtering
ShelvingPhilosophyTime limited; logged
NotificationRosterBy priority; escalation

Frequently asked questions

Controller alarm or SCADA alarm?
Controller for anything about the process or equipment: it is evaluated every scan, survives a SCADA outage, and drives interlocks. SCADA for the system health items the controller cannot see. Both appear in the same alarm system.
How many priorities?
Three or four: urgent, high, medium, low, or similar. More than four cannot be distinguished by an operator under load.
What alarm rate is acceptable?
The commonly cited targets are on the order of one or two alarms per operator per ten minutes on average, and a flood is more than ten in ten minutes. Rates above that mean rationalization was skipped or the limits are wrong.
Should every alarm call out?
No. Urgent and high call out per the roster; medium and low wait for the screen. A pager that goes off for a door open at noon is a pager that gets ignored at midnight.

Direct contact