To build a terminal schedule, define the terminal strips of the panel by voltage class and function with a designation and a numbering scheme, then list every terminal on every strip with the wire number on the panel side, the wire or cable and conductor on the field side, the device each connects to, and the field destination with its drawing reference; generate the list from the schematic with the drafting tool or a spreadsheet driven by the wire numbers, so that the schedule and the drawing cannot disagree; mark the spares; check it against the built panel terminal by terminal and against the field cables at pull-in; and put it in the panel pocket and the engineering library with a revision, updating it as part of every change rather than afterward.
Key points
- Strips by voltage class and function, each with a designation and a numbering scheme fixed for the plant.
- Every terminal: panel wire number, field cable and conductor, device, destination, drawing reference.
- Generate from the schematic; a schedule typed by hand diverges from the drawing on the first change.
- Reconcile at panel checkout and at cable pull-in; mark spares explicitly.
- Revision controlled, in the panel pocket and the library, updated with every change.
What you need
- The panel schematic with wire numbers and terminal designations
- The cable schedule and the I/O list
- The drafting tool report function, or a spreadsheet template with the schedule columns
- The plant numbering convention for strips, terminals, and wires
- Terminal markers and a label printer for the panel
Procedure
- 1
Define the strips
One per voltage class and function: power distribution, 120 volt control, 24 volt discrete inputs, 24 volt discrete outputs, analog, network, intrinsically safe, and grounds. Designate each, for example TB1 to TB8 or by function, per the plant convention.
- 2
Set the numbering
Terminals numbered sequentially within each strip; multi-level terminals with a level suffix; wire numbers by the plant convention, such as sheet and line, so that a wire number locates the schematic.
- 3
Assign the field connections
From the I/O list and the cable schedule: each field point lands on a pair or a group of terminals on the strip for its class, grouped by cable so that a cable lands on adjacent terminals, with shield terminals beside the analog pairs.
- 4
Draw it
On the schematic, every field connection shows the strip and terminal; the wire numbers on both sides. The drawing is the source.
- 5
Generate the schedule
The drafting tool report or a spreadsheet built from the wire list: strip, terminal, panel wire number, panel device and terminal, field cable and conductor, field device, destination drawing. Sort by strip and terminal.
- 6
Mark spares
Every unused terminal listed as SPARE; spare cable conductors listed against their cable and marked spare at both ends.
- 7
Check the panel
At panel checkout, walk every strip with the schedule: the marker, the wire number, and the destination match; corrections go back to the schematic first, then the schedule is regenerated.
- 8
Check the field
At cable pull-in and termination, each conductor landed per the schedule, and the schedule corrected for any field change with the reason.
- 9
Issue it
A revision number and date; a copy in the panel pocket, one in the engineering library with the schematic, and one with the commissioning records.
- 10
Maintain it
Every change to the panel starts with the schematic and ends with a regenerated schedule and a new pocket copy. A schedule that is not updated is a trap.
| Column | Content | Example |
|---|---|---|
| Strip | Terminal strip designation | TB3 (24 VDC inputs) |
| Terminal | Number and level | 14, 14L (lower level) |
| Panel wire | Wire number on the panel side | 1234 |
| Panel device | Device and terminal it connects to | DI-1 slot 2 ch 6 |
| Field cable | Cable number and conductor | C-120 / 3 (black) |
| Field device | Tag | LSH-101 |
| Destination | Location and drawing | Wet well JB-1, sheet E-12 |
| Notes | Shield, spare, fused, disconnect | Shield to SH bar |
Frequently asked questions
- Spreadsheet or drafting tool report?
- The drafting tool report where the schematic is drawn in a tool that tracks wires; it cannot disagree with the drawing. A spreadsheet driven from the wire list otherwise, with a discipline that the drawing changes first.
- How do I number terminals on a multi-level block?
- One number per position with a level suffix, upper, middle, lower, or U, M, L, and the schematic drawn to show the levels. A three-level strip drawn as flat terminals is where wiring errors come from.
- What about junction boxes in the field?
- Each junction box has its own schedule on the same pattern, with its cable in and cables out, and the panel schedule references the box and its terminal. The chain from panel to device is traceable through the schedules.
- The panel shop wired it differently from the schedule.
- Find out why; sometimes the layout forced it. Then the schematic is corrected to what was built, the schedule regenerated, and the panel re-marked if needed. Never two documents that disagree.
Related topics
- TerminalsDesigning the terminal strips of a control panel: grouping by voltage and function, numbering that matches the drawings, fused and disconnect terminals for instrument loops, shield and ground terminals, spares, ferrules and torque, and the terminal schedule.
- Terminal BlocksThe point where field wiring meets the panel: screw, spring, and push-in terminals, ratings and the UL 1059 groups, fused and disconnect terminals for instrument loops, grounding terminals, multi-level blocks, jumpers and marking, and the layout that makes a loop check or a field change a five-minute job.
- Cable SchedulesThe list of every cable with what it is, where it runs, and where it lands: the columns, the numbering convention, types and signal classes, routes through conduits and trays, lengths, terminations, spares, and status from design through as-built.
- I/O ListsThe document that ties the field to the controller: what every I/O list column means, how tags, terminals, and module channels are assigned, spare capacity rules, how the list drives the drawings and the program, and how to keep it true after commissioning.
- Control SchematicsThe ladder-style drawing of every control circuit in a panel: how a schematic is organized by line number, the conventions for contacts, coils, and cross-references, what belongs on a schematic and what belongs on a wiring diagram, and reading one under pressure.
- Wiring DiagramsThe drawing that says where every wire goes: panel wiring and interconnection diagrams, and the conventions of wire numbers, conductor colors, terminal numbers, and cable numbers that make them readable. What belongs here versus on the schematic.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.