The short answer
OT Incident Response Plan
An operational technology incident response plan says what a utility does when its control system may be compromised: who has the authority to disconnect and to declare an incident, what triggers the plan, how the plant keeps treating water while the SCADA is isolated, who is called and in what order, how evidence is preserved for the investigation, how systems are rebuilt from trusted backups, and how the utility returns to normal. It is short, it is on paper, and it has been exercised with the people named in it.
Key points
- Decide in advance who can disconnect the control system. Hesitation is the expensive part.
- Treatment continues by hand. The plan says how, and the operators have practiced it.
- Isolate, do not power off. A machine turned off loses the evidence of what happened.
- The call list is on paper in the control room, with the state, the agencies, the vendor, and the integrator.
- Exercise it once a year with a scenario. A plan that has not been walked through is a document.
Why a separate OT plan
A utility may already have an IT incident plan from its municipal or corporate parent, and it will say to isolate the affected machines, preserve evidence, and call the security team. On a control system those instructions collide with the process: isolating the SCADA server blinds the operators, powering off a controller stops a pump, and the security team does not know what a lift station is. The OT plan is written for that collision. Its first objective is safe and compliant treatment; its second is containing the compromise; its third is investigation and recovery. When they conflict, the plan says which wins and who decides.
The structure
- Authority
- By name and role: who may declare an incident, who may order the control system isolated from every external connection, who may order a return to manual operation, who speaks to the regulator and the public. The operator on shift has the authority to isolate and go manual without waiting for anyone, because the plan says so.
- Triggers
- The observations that start the plan: a setpoint or a program that changed without a record, an unknown login or remote session, ransomware on any utility machine, a vendor reporting a compromise, an agency advisory naming the utility equipment, a process behaving in a way that has no physical explanation. Any operator can call a trigger; the plan says who they call.
- The first hour
- The ordered actions below.
- Manual operation
- The procedure for running each process without SCADA, by reference to the manual operation procedures, with the staffing needed and the limits: how long the plant can run this way, what compliance sampling changes.
- Communications
- The call list, the order, the scripts for the regulator and the public, and the rule that nobody speaks outside the utility except the named spokesperson.
- Evidence
- What to preserve and how: logs, images, the physical devices, the timeline the operators write as it happens.
- Recovery
- How trusted systems are rebuilt from offline backups, verified, and returned to service in order, with the criteria for trusting them again.
- After
- The review, the report, the changes to the plan and the system, and the notification of anyone who must be told.
The first hour
- 1
Keep treating
Confirm the process is safe: residuals, levels, pressures, from local instruments if the SCADA is suspect. Put critical loops in manual or local control. Send operators to unattended sites that cannot be trusted remotely.
- 2
Isolate
Disconnect the control network from the office network and the internet at the firewall: pull the cable or disable the interface. Disable every remote access path. Do not power off servers or controllers; a powered device keeps its memory and its logs.
- 3
Declare and call
The person with authority declares the incident. The first calls go to the people who will run the plant and the people who will investigate: the superintendent, the integrator, the agency contact. The regulator is called within the time the permit or the state requires, which may be hours.
- 4
Start the timeline
One person writes down, with times, everything observed and everything done, on paper. It is the most valuable document of the incident and it cannot be reconstructed later.
- 5
Preserve
Leave the affected machines running and isolated. Photograph screens. Do not log in and poke around; every action changes the evidence. If a machine must be taken out of service, image it first if anyone present can, or set it aside powered off and untouched.
- 6
Check the controllers
Compare the running programs against the trusted backups on the engineering workstation, offline. A changed program is isolated and replaced from backup only after the comparison is recorded. Check keyswitch positions and set them to RUN.
- 7
Assess the process
With the process in manual, walk through what an attacker could have changed: setpoints, alarm limits, chemical feed rates, valve positions. Verify each against the last known good values and against physical readings.
Who to call
| Who | When | Why |
|---|---|---|
| The operator in charge and the superintendent | Immediately | Authority, staffing, and decisions |
| The integrator or the control system contractor | Within the hour | They know the system and hold the backups |
| The state drinking water or wastewater program | Within the notification window in the permit or the state rule | Regulatory requirement; they also coordinate help |
| The federal agencies that support the water sector and national cybersecurity | Same day | Free incident assistance, forensics, and the reporting that helps other utilities |
| Law enforcement | When the incident is criminal, which most intrusions are | Investigation and evidence |
| The insurer | Per the policy, often within a day | Coverage conditions |
| Vendors of affected products | When their product is involved | Firmware, forensics, and advisories |
| The public | When service or water quality is affected, through the spokesperson | Trust and compliance |
The list, with names and numbers, is on paper in the control room and in the superintendent vehicle, because the incident may take the systems that hold it.
Recovery
Recovery rebuilds the control system from trusted sources onto hardware that is known clean. SCADA servers are rebuilt from the offline image or from a fresh install and the offline project export, never from the compromised machine. Controllers are verified against the offline program backup and reloaded where they differ. Network devices are restored from configuration backups after their firmware is verified. Every credential is changed. The path the attacker used is closed before anything is reconnected, and the reconnection is staged: controllers to SCADA first, with monitoring, then the historian, then remote access last and only through the MFA path. The order, the criteria for each step, and who signs off are in the plan.
The exercise
Once a year, the people named in the plan sit at a table with a scenario: a Monday morning, the SCADA screens show a ransom note, the lift stations are reporting normally. They walk through the plan in order, out loud, with the paper copy, and someone writes down every point where the plan did not say what to do or the people did not know how. The gaps become changes. The exercise takes two hours and it is the difference between a plan and a binder.
Frequently asked questions
- How long should the plan be?
- Short enough to read under stress: a few pages for the authority, the triggers, the first hour, and the call list, with the manual operation procedures and the recovery details as appendices. A fifty-page plan is not opened during an incident.
- Who should have the authority to disconnect?
- The operator on shift, for the control network from the outside world, because waiting for a manager while an attacker is active is the worst outcome. Broader decisions, such as taking a plant to full manual for days or notifying the public, sit with the superintendent or the director. The plan names both.
- What if we are not sure it is an incident?
- Treat it as one until it is shown not to be. Isolating the control network and going to manual for a few hours costs an inconvenient shift. Not doing so when it was real costs the plant. The plan lowers the threshold for calling a trigger on purpose.
- Do we need to report an incident that did no harm?
- Usually yes, to the state and often to the federal agencies, under the utility permit and the reporting rules that apply, and it is worth doing regardless: the agencies use reports to warn other utilities, and their assistance is free. The plan lists what must be reported, to whom, and by when.
Related topics
- Small Utility Cybersecurity PrioritiesWhat a utility with a few operators and no IT department should do first: the ten measures that remove most of the risk for the least money and time, in the order to do them, with what each one costs, what it prevents, and how to know it is done.
- What to Back Up in a Control SystemWhat a utility must be able to restore after a failure or attack: controller programs and firmware, SCADA and historian, HMI panels, drive and instrument parameters, network configurations, licenses, installers, and documentation, and how often each changes.
- PLC Program BackupsWhat a complete controller backup contains, how often to take one, where to keep it, why the upload from the running controller is not the master, and the verification that turns a folder of files into a recovery plan.
- Vendor Remote AccessIntegrators and equipment vendors need to get in. How to let them without leaving a permanent door open: utility-controlled sessions, named accounts, MFA, a jump host, session recording, and what to do about the modem you did not know was there.
- Water and Wastewater Utility Threat LandscapeWhat has actually happened at water utilities, what those incidents had in common, and the small number of controls that would have prevented most of them.
- Controller HardeningWhat can be locked down on a PLC or RTU: keyswitch and mode, credentials, unused services, access lists, firmware, and the engineering workstation that is the real target.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.