The short answer
The Alarm Philosophy
An alarm philosophy is the short document a plant writes before rationalizing, configuring, or auditing any alarm. It states what an alarm is, an abnormal condition that requires an operator to act, and what is not, states the criteria a condition must meet, defines the priorities and how they are assigned from consequence and time to respond, sets the performance targets the system will be measured against, and lays out the rules for shelving, suppression, and change. Everything else in alarm management is checked against it.
Key points
- An alarm requires operator action. A condition with no action is a status, an event, or a log entry, not an alarm.
- Priority is assigned from consequence and time to respond, using a matrix in the philosophy, not from how loud someone argued for it.
- The philosophy sets numeric targets: alarms per operator per hour, priority distribution, and standing alarm counts.
- It fixes the rules for shelving, designed suppression, and out-of-service alarms so those tools are used and not abused.
- It is owned by operations, it is short, and it outlives the SCADA platform it was written for.
Why a document, not a setting
Alarm systems go bad one alarm at a time. A commissioning engineer alarms every diagnostic bit. A supervisor asks for an alarm on a pump start. A vendor package arrives with two hundred alarms preconfigured. Five years on the operator sees a thousand alarms a shift and acknowledges them in blocks without reading them, and the one that mattered is in the block. No setting prevents that. A written definition of what an alarm is, applied to every proposed alarm by someone with the authority to say no, is the only thing that does. ISA-18.2 puts the philosophy at the start of the lifecycle for that reason.
What it contains
- 01Purpose and scope: what systems and what sites the philosophy governs, and who must follow it.
- 02The definition of an alarm and the criteria a condition must meet to become one.
- 03The priority levels, what each means to the operator, and the matrix that assigns one from consequence and time to respond.
- 04The alarm classes, for alarms with regulatory, safety, or environmental significance that carry extra requirements for testing and record keeping.
- 05Performance targets and how they are measured.
- 06How alarms are presented: the HMI conventions, sounds, colors, and the alarm summary, in agreement with the HMI philosophy.
- 07The rules for shelving, designed suppression, and out-of-service alarms.
- 08Roles: who may propose, approve, change, and remove an alarm, and how changes are recorded.
- 09How the system is monitored and audited, and how often the philosophy itself is reviewed.
The criteria
The test every proposed alarm has to pass is stated in a few lines and applied without exception.
- It requires an operator response
- There is a specific action the operator takes when it occurs. If the answer to what the operator does is nothing, or watch it, it is not an alarm.
- The response prevents or mitigates a consequence
- Acting matters. A condition that resolves itself, or whose consequence is unaffected by anything the operator can do, is an event.
- It is unique
- It is not already indicated by another alarm. A high level alarm and a high level float alarm and a pump overload that all announce one overflow are one alarm and two nuisances.
- It is timely
- It arrives with enough time for the response to work, and not so early that it is ignored as premature.
- It has a defined limit and a defined deadband or delay
- So that it does not chatter and so that its meaning is stable.
Priority
Priority tells the operator which of several alarms to deal with first. It is assigned from two things: the consequence of not responding, in categories the plant defines for safety, environment, equipment, and production, and the time available to respond before the consequence. A matrix in the philosophy maps each combination to a priority, and every alarm is assigned by that matrix during rationalization. Three priorities, sometimes four, are the norm. More than that and the operator cannot tell them apart.
| Time to respond | Minor consequence | Serious consequence | Severe consequence |
|---|---|---|---|
| More than 30 minutes | Low | Low | Medium |
| 10 to 30 minutes | Low | Medium | High |
| Less than 10 minutes | Medium | High | High |
Performance targets
The philosophy states what an acceptable alarm load is, so that the system can be measured against it. The benchmarks in ISA-18.2 and EEMUA 191 are the usual reference: on the order of one alarm per ten minutes per operator in steady operation as a manageable load, with more than that becoming demanding and several times that unacceptable; a small number of standing alarms; no alarm floods, defined as more than ten alarms in ten minutes; and a bounded number of chattering alarms. The point is not the exact numbers. It is that the numbers exist, are measured monthly, and drive the rationalization of whatever is producing the load.
The handling rules
- Shelving
- An operator temporarily removing an alarm from view for a bounded time, with the shelving visible and logged. The philosophy sets the maximum duration, who may shelve which priorities, and that shelved alarms return automatically.
- Designed suppression
- Alarms suppressed by logic because they are meaningless in a plant state, a low flow alarm on a pump that is off. Designed during rationalization, documented, and not available to the operator to change.
- Out of service
- An alarm removed for maintenance of the instrument, by authorization, with a record and a return date.
- Change
- Any change to a limit, priority, or the existence of an alarm goes through the management of change process the philosophy defines, with the rationalization record updated.
Writing it
The philosophy is short, ten to twenty pages for most plants, written in the plant’s own words, owned by operations rather than by the integrator, and approved by whoever is accountable for the plant. It refers to the HMI philosophy and the control narratives rather than repeating them. It is reviewed on a schedule and whenever the plant changes. And it is applied: the first rationalization workshop after it is written is where it either becomes the way the plant works or becomes a document on a shelf.
Frequently asked questions
- What is the difference between an alarm and an event?
- An alarm requires an operator to do something. An event is something worth recording, a pump start, a mode change, a setpoint change, that requires no action. Events go in the log; alarms go in the alarm summary. Confusing the two is how alarm summaries fill up.
- How many alarm priorities should we have?
- Three is the usual answer, occasionally four with a diagnostic or urgent level. More than that and the operator cannot rank them at a glance, which defeats the purpose.
- Who writes the alarm philosophy?
- Operations, with engineering and the integrator contributing, and the plant’s management approving it. It is the plant’s statement of how it will run, and an integrator-written philosophy that operations did not shape is rarely followed.
- How does the philosophy relate to ISA-18.2?
- ISA-18.2 defines the alarm management lifecycle and puts the philosophy at its start. The philosophy is the plant’s document; the standard is the framework that says what it should contain and what comes after it.
Related topics
- ISA-18.2 Alarm ManagementThe lifecycle standard for alarm systems, the rate targets that define a workable system, and why alarm rationalization is the step nobody wants to fund.
- Alarm RationalizationThe meeting where every alarm earns its place: who attends, what is decided for each alarm, how to document it in a master alarm database, and how to run it at a utility that cannot spare a week.
- Alarm PriorityHow to assign alarm priorities that operators trust: a consequence-and-time matrix, three or four levels, the target distribution from ISA-18.2 and EEMUA 191, and the mistakes that make every alarm high.
- ISA-101: Human Machine InterfacesWhat the ISA-101 standard for human machine interfaces covers, its lifecycle from philosophy to maintenance, the display hierarchy, and what adopting it changes on a project.
- Alarms in the ControllerGenerating alarm conditions in the controller rather than in the graphics: why the PLC should own the alarm state, a standard alarm block with setpoints, deadband, and delays, equipment alarms, and packing alarm bits for SCADA.
- Alarm ShelvingThe operator tool for temporarily silencing a nuisance alarm: what shelving is and is not, the rules a philosophy sets, who may shelve what and for how long, automatic unshelving, the shelved list, the record, and how to implement it on any platform.
Direct contact
Have a controls question?
Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.