Skip to main content
Call Eric:863-698-8266
CURRYCONTROLS.COMControls & Automation Knowledge Hub

Controls › PLC Systems

PLC Troubleshooting

Symptom-first diagnosis for a controller that is not behaving.

7 topics7 written guides

Written guides in this section

Full references, procedures, and diagnostic guides published under PLC Troubleshooting.

ReferencePLCTroubleshooting

PLC Will Not Run

A controller that stays in program mode, faults on every attempt to run, or will not power up: the mode switch, the major fault log, the power supply, the memory and battery, the firmware and program mismatch, and the I/O configuration errors that stop a processor, in the order that finds them.

9 min readUpdated Sep 5, 2026

ReferencePLCTroubleshooting

I/O Not Updating

Inputs that do not change and outputs that do not respond while the controller runs: the module and rack status, the inhibited and faulted connections, the input filter and the scan, the remote adapter link, the forced points, and the program that stopped writing the tag.

9 min readUpdated Sep 5, 2026

ReferencePLCTroubleshooting

Communication Failures

What to read when a controller stops talking to a device, another controller, or SCADA: port and connection status, message error codes, timeouts and retries, addressing, limits, and the order of checks that separates controller, cable, device, and network.

8 min readUpdated Sep 5, 2026

ReferencePLCTroubleshooting

Analog Signal Problems

The controller side of a bad analog value: raw counts against the module range, channel diagnostics, scaling that does not match the transmitter, wiring by device type, noise and filtering, resolution, and a symptom table that points at the check.

8 min readUpdated Sep 5, 2026

ReferencePLCTroubleshooting

Program Faults

Faults the program causes: an index out of range, division by zero, an invalid indirect address, a missing routine, a type mismatch, or task overlap. Reading the fault record, what a fault handler should do, clearing safely, and logic that does not fault.

8 min readUpdated Sep 5, 2026

ReferencePLCTroubleshooting

Watchdog Faults

A task that did not finish in time: what the watchdog protects, why the scan grew, and how to fix it. Measuring task times, finding the loop or instruction that took the time, communications load, and when raising the watchdog is legitimate.

7 min readUpdated Sep 5, 2026

Topics in this area

Direct contact

Have a controls question?

Reach Eric Sullivan directly about anything on this site, a controls or automation topic, or one of his personal projects.

References to manufacturers, products, model numbers, software platforms, technical specifications, companies, standards organizations, or other organizations are provided for informational purposes and do not imply sponsorship, endorsement, authorization, or affiliation unless expressly stated. Manufacturer specifications must be independently verified against current manufacturer documentation.