Water & Wastewater
Wet Well Volume and Pump Cycle Time
Working volume, fill time, pump-down time, cycle length, and starts per hour for a wet well, including the worst-case inflow for cycling.
Calculated reference results
- Working volume
- 1,128gal
- Cycle time at this inflow
- 16.9 min
- Starts per hour at this inflow
- 3.56
- Worst-case starts per hour
- 4.65
- Against the motor limit
- Within limit
- Volume needed for the starts limit
- 1,313gal
- Detention time at this inflow
- 12.5 min
- Pump run time per cycle
- 4.3min
50.3 sq ft x 3.00 ft
12.5 min fill, 4.3 min pump down
Occurs at an inflow of 175 gpm, which is half the pump capacity
4.7 worst-case starts against a limit of 8
Band of about 3.49 ft
The arithmetic
- Area = 50.27 sq ft
- Working volume = 50.27 sq ft x 3.00 ft x 7.48052 = 1,128 gal
- Fill time = 1,128 / 90 gpm = 12.5 min
- Pump down = 1,128 / (350 - 90) = 4.3 min
- Worst case at 175 gpm inflow gives 4.65 starts per hour
What this does not account for
- The worst case for short cycling is an inflow of half the pump capacity, not the lowest inflow. Sizing the level band against low flow alone misses the real constraint.
- A wider band reduces starts but increases detention time, and long detention turns the well septic and generates hydrogen sulfide that corrodes the structure downstream. Both constraints have to be satisfied.
- Pump run time must also be long enough to reach scour velocity in the force main, or solids settle in it.
- This assumes a constant inflow and a constant pump rate. Real inflow varies through the day and pump rate varies with wet well level.
How this is calculated
Wet well working volume is the plan area multiplied by the depth between the pump start and stop levels. Cycle time is the fill time plus the pump-down time, and starts per hour is 3600 divided by the cycle in seconds. The worst case for short cycling is an inflow of half the pump capacity, not the lowest inflow.
Formulas
Volume (gal) = area (sq ft) x band (ft) x 7.48
Cycle = volume / inflow + volume / (pump capacity - inflow)
Starts per hour = 60 / cycle in minutes
Worst case occurs at inflow = pump capacity / 2
Assumptions and limitations built into this calculator
- Constant inflow and constant pump rate.
- Uniform cross-section over the level band, which is not true of a benched or sloped wet well.
- Single pump running. Duplex operation with both pumps changes the pump-down rate.
Frequently asked questions
- Why is the worst case at half the pump capacity?
- Cycle time is fill time plus pump-down time. At low inflow the fill is long; at high inflow the pump-down is long. The two combine to a minimum when inflow is half the pump rate, and that is where starts per hour peak.
- How wide should the level band be?
- Wide enough that worst-case starts stay within the motor rating, and narrow enough that detention time at low flow does not turn the well septic. Calculate both and use the widest band the detention limit allows.