Partial Summary and Listing of Recent Project Experience
|
Project Name |
Client Name |
Location |
Year Com |
Work Performed |
Type of Work |
Value |
|
Water Filter Plant Expansion at Scott Chandler WFP |
Archer Western Contractors |
Dekalb County, GA |
2004 |
Provided 29 PLC panels and associated programming and field terminations. Provided ultrasonic transmitters, venturis, particle counters, PH and chlorine analyzers, magnetic flow meters, % solids analyzer, and other field instrumentation. Provided SCADA, HMI programming, servers and peripherals. |
Subcontractor, Systems Integrator (Project Not Complete) |
$2,900,000.00 |
|
William E. Dunn Water Reclamation Facility |
Pinellas County Utilities |
Palm Harbor, FL |
2002 |
Furnished and installed 8 PLC Systems, Fiber Optic Communications links, and SCADA HMI applications. Also includes Closed Circuit security cameras and recording systems. |
Engineering, General Contracting and System Integration |
$1,925,000.00 |
|
Publix Refrigeration Control System |
Publix Super Markets |
Lakeland, FL |
2002 |
System install included HMI SCADA servers for energy management coupled with distributed Allen-Bradley PLC systems serving host, engine room, compressor, condenser, NH3 evaporator, and MCC Panel systems and field instrumentation in various Deli, produce, dairy, meat and other plant locations |
Systems Integrator |
$945,000.00 |
|
SCADA System Improvements |
City of Tamarac Utilities Department |
Tamarac, FL |
2002 |
Supplied over 94, PLC based remote controllers for lift station control, well control and monitoring and associated radio telemetry communications and instrumentation package. Included associated Computer HMI SCADA improvements |
Systems Integrator |
$1,946,923.00 |
|
GasAtacama Pipeline SCADA |
GasAtacama |
Santiago,Chile, South America |
1999 |
Designed and installed electrical and control system for gas pipeline pumping systems spanning 780 mile Argentina/Chile desert. Integrated Satellite radio communications to 20 RTU locations for value control. |
Engineering, General Contractor & Systems Integrator |
$3,000,000.00 |
|
I & C Upgrades to Water and Wastewater Utilities |
City of Hollywood, Utilities Department |
Hollywood, FL |
1999 |
Performed Instrument and control system upgrades at the WTP and WWTP facilities. Provided spread spectrum radio connectivity to well fields and licensed 900 MHz communications to 140 remote sites. Solar powering was provided for some locations. PLCs and Intellution SCADA were used. |
General Contractor, Electrical Contractor, Systems Integrator |
$1,900,000.00 |
|
Palm Beach Water Utilities |
Palm Beach County |
WPB, FL |
1998 |
Designed and installed centralized Telemetry Information System. System monitors over 500 sewage lift stations. Furnished Radio Telemetry to local well systems. |
Design, General Contracting, Electrical Contracting, Systems Integration |
$1,200,000.00 |
|
Eastern Regional Water Supply Facility |
Orange County Utilities |
Orange County, FL |
1997 |
Fully integrated control room and associated Ethernet WAN communicating with 18 other water treatment plants. LAN is a redundant, self healing ring configuration. Furnished 3 SCADA workstations, two of which are configured for redundancy. |
Subcontractor and Systems Integrator |
$1,400,000.00 |